{"id":13019,"date":"2026-11-13T17:02:00","date_gmt":"2026-11-13T16:02:00","guid":{"rendered":"https:\/\/petit-montagnard.fr\/?p=13019"},"modified":"2026-11-13T17:05:35","modified_gmt":"2026-11-13T16:05:35","slug":"106-million-euros-to-connect-the-station-to-the-ski-slopes-the-limagne-telecabin-project","status":"publish","type":"post","link":"https:\/\/petit-montagnard.fr\/en\/106-millions-deuros-pour-relier-la-gare-aux-pistes-limmense-projet-de-telecabine-de-la-plagne\/","title":{"rendered":"La Plagne: what is this huge cable car project to connect the station to the slopes as early as 2029?"},"content":{"rendered":"

La Plagne<\/a> The Vall\u00e9e du Soleil project between the Aime-la-Plagne station and Plagne Centre is advancing. The approximately six-kilometer cable car connection, with a stop at the Olympic bobsleigh track, is estimated at 106 million euros and is scheduled to be delivered before the 2030 Olympic Games.<\/strong><\/p>\n\n\n\n

Today, 18 kilometers of road separate the Aime-la-Plagne train station from Plagne Centre. By 2030, the journey could be made by air.<\/p>\n\n\n\n

The Vall\u00e9e lift project includes a cable car in two sections connecting 700 meters of altitude to 1,970 meters. An intermediate station would be installed at an altitude of The Olympic track for bobsleigh<\/a>, At about 1,550 meters.<\/p>\n\n\n\n

Six kilometers of cable<\/h2>\n\n\n\n

The total length would be approximately six kilometers. The investment is estimated at 106 million euros. The project is not intended to be used solely during the summer. 2030 Olympic Games<\/a>. The communities present it as an infrastructure that will remain at the service of the residents, employees and holidaymakers long after the event has passed.<\/p>\n\n\n\n